---
title: "Overseas Hardware Procurement Demand Hall (UT-HW-2612-001..131) | U-TRADE GATEWAY LIMITED"
description: "Hong Kong-based cross-border industrial coordination platform linking Shanghai and Hong Kong — Interactive Demand Hall with 131 verified hardware procurement demands across UT-CAT-01..08."
lang: "en"
source_path: "/en/demands/"
canonical: "https://umaotong.com/en/demands/"
content_sha256: "f7be822ed221bf525bf6295c0fc33614d94739c185f7781734c4103e043727a8"
---

# Overseas Hardware Procurement Demand Hall (UT-HW-2612-001..131) | U-TRADE GATEWAY LIMITED

OVERSEAS HARDWARE DEMAND HALL · UT-CAT-01..08

# Overseas Hardware Engineering Demand Hall

Cross-border industrial coordination and going-global service platform based in Hong Kong and linking Shanghai and Hong Kong. Featuring 131 verified coded hardware demands across 8 specialized pavilions (101 Fixed-RFP notices and 30 Standing DPS pools) with interactive filtering by pavilion, destination macro-region, procurement mode, and technical specification keywords.

**131** Verified Coded Demands
**101** Fixed-Window RFPs (FIXED_RFP)
**30** Standing DPS Pools (DPS_STANDING)
**8** Industry Pavilions (UT-CAT-01..08)

## Interactive Engineering Specification Filter & Search

Showing **131** / 131 verified coded demands
Category Pavilion (UT-CAT-01..08)
All 8 Category Pavilions (131) UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion UT-CAT-03 Open Network Switching & Campus High-Reliability Comms Pavilion UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
Macro Destination Region
All Destination Macro-Regions Pan-European & Central-Southern Europe Asia-Pacific & Oceania Southeast Asia Western & Northern Europe International Multilateral Procurement North America Commonwealth, North America & Europe Middle East & Emerging Markets
Procurement Mode
All Modes (FIXED_RFP + DPS_STANDING)
FIXED_RFP · Fixed-Window RFPs (101)
DPS_STANDING · Standing DPS Pools (30)
Keyword Search (Demand Code / Specs / Standards / Industrial Belts)
Reset Filters
All Modes (FIXED_RFP + DPS_STANDING)
DPS_STANDING · Standing DPS Pools (30)
FIXED_RFP · Fixed-Window RFPs (101)
All 8 Category Pavilions (131) UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion UT-CAT-03 Open Network Switching & Campus High-Reliability Comms Pavilion UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion

### No Matching Hardware Procurement Demands Found

Adjust the selected pavilion category, destination macro-region, procurement mode, or clear the search query to view all 131 standardized hardware demands.

## 1. Standing Dynamic Purchasing System Pools (DPS_STANDING · 30 Pools · 14-Day Recheck)

Multi-year qualification pools and framework agreements with >4-week onboarding windows for rolling technical qualification.

[UT-HW-2612-030 · UT-CAT-01](/demands/ut-hw-2612-030/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-030] Southeast Asia · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-030/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; 400G/100G optical-copper interfaces; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-030/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-030)
[UT-HW-2612-031 · UT-CAT-01](/demands/ut-hw-2612-031/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-031] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-031/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified); metered smart rack PDU & branch monitoring. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-031/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-031)
[UT-HW-2612-032 · UT-CAT-01](/demands/ut-hw-2612-032/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-032] Commonwealth, North America & Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-032/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; MPO/APC pre-terminated trunks (3D interferometry); IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-032/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-032)
[UT-HW-2612-033 · UT-CAT-01](/demands/ut-hw-2612-033/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-033] Commonwealth, North America & Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-033/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-033/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-033)
[UT-HW-2612-034 · UT-CAT-01](/demands/ut-hw-2612-034/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-034] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-034/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified); IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE / IEC 60601-1 compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE IEC 60601-1
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-034/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-034)
[UT-HW-2612-035 · UT-CAT-01](/demands/ut-hw-2612-035/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-035] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-035/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-035/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-035)
[UT-HW-2612-038 · UT-CAT-03](/demands/ut-hw-2612-038/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-038] Commonwealth, North America & Europe · Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-038/)

Scope: Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits. Engineering Specs: 400G/100G optical-copper interfaces; MPO/APC pre-terminated trunks (3D interferometry); IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IEEE 802.3ck / CE / FCC / RoHS / REACH compliance documentation and factory test reports.

IEEE 802.3ck CE FCC RoHS REACH
**Pavilion Track:** UT-CAT-03 Open Network Switching & Campus High-Reliability Comms Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Hangzhou (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-038/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-038)
[UT-HW-2612-040 · UT-CAT-02](/demands/ut-hw-2612-040/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-040] Commonwealth, North America & Europe · PCIe Gen5 Offload SmartNICs & Hardware Telemetry Capture Subsystems (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-040/)

Scope: PCIe Gen5 Offload SmartNICs & Hardware Telemetry Capture Subsystems. Engineering Specs: PCIe Gen5 & SFF-8654 (85-ohm TDR verified); out-of-band IP-KVM & serial console appliances; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: PCIe Gen5 / CE / FCC / RoHS / REACH compliance documentation and factory test reports.

PCIe Gen5 CE FCC RoHS REACH
**Pavilion Track:** UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Pudong/Zhangjiang · Beijing Cluster · Nanjing/Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-040/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-040)
[UT-HW-2612-054 · UT-CAT-04](/demands/ut-hw-2612-054/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-054] Commonwealth, North America & Europe · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-054/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: metered smart rack PDU & branch monitoring; high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 / IEC 61850 compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3 IEC 61850
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-054/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-054)
[UT-HW-2612-060 · UT-CAT-05](/demands/ut-hw-2612-060/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-060] Commonwealth, North America & Europe · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-060/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-060/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-060)
[UT-HW-2612-061 · UT-CAT-05](/demands/ut-hw-2612-061/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-061] Commonwealth, North America & Europe · Industrial Embedded SOM Carrier Boards, Sensing PCBA & Solid-State Timing (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-061/)

Scope: Industrial Embedded SOM Carrier Boards, Sensing PCBA & Solid-State Timing. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: CE / FCC / RoHS / REACH / Non-DG compliance documentation and factory test reports.

CE FCC RoHS REACH Non-DG
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shenzhen/Guangzhou (Guangdong) · Shanghai Cluster · Hangzhou (Zhejiang)
[View Engineering Spec Card →](/demands/ut-hw-2612-061/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-061)
[UT-HW-2612-062 · UT-CAT-05](/demands/ut-hw-2612-062/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-062] Commonwealth, North America & Europe · Industrial Embedded SOM Carrier Boards, Sensing PCBA & Solid-State Timing (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-062/)

Scope: Industrial Embedded SOM Carrier Boards, Sensing PCBA & Solid-State Timing. Engineering Specs: uncooled thermal imaging module & IP67 housing; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: CE / FCC / RoHS / REACH / Non-DG compliance documentation and factory test reports.

CE FCC RoHS REACH Non-DG
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shenzhen/Guangzhou (Guangdong) · Shanghai Cluster · Hangzhou (Zhejiang)
[View Engineering Spec Card →](/demands/ut-hw-2612-062/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-062)
[UT-HW-2612-063 · UT-CAT-05](/demands/ut-hw-2612-063/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-063] Asia-Pacific & Oceania · Multispectral Industrial Vision Modules & Hardwired Edge Video Analyzers (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-063/)

Scope: Multispectral Industrial Vision Modules & Hardwired Edge Video Analyzers. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses; uncooled thermal imaging module & IP67 housing. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: CE / RoHS / REACH / GenICam / IEC 60825 compliance documentation and factory test reports.

CE RoHS REACH GenICam IEC 60825
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Cluster · Hangzhou/Yuyao (Zhejiang) · Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-063/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-063)
[UT-HW-2612-064 · UT-CAT-05](/demands/ut-hw-2612-064/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-064] Commonwealth, North America & Europe · Multispectral Industrial Vision Modules & Hardwired Edge Video Analyzers (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-064/)

Scope: Multispectral Industrial Vision Modules & Hardwired Edge Video Analyzers. Engineering Specs: uncooled thermal imaging module & IP67 housing. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: CE / RoHS / REACH / GenICam / IEC 60825 compliance documentation and factory test reports.

CE RoHS REACH GenICam IEC 60825
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Cluster · Hangzhou/Yuyao (Zhejiang) · Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-064/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-064)
[UT-HW-2612-068 · UT-CAT-06](/demands/ut-hw-2612-068/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-068] Southeast Asia · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-068/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 60601-1 / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 60601-1 IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-068/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-068)
[UT-HW-2612-070 · UT-CAT-06](/demands/ut-hw-2612-070/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-070] Southeast Asia · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-070/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-070/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-070)
[UT-HW-2612-071 · UT-CAT-06](/demands/ut-hw-2612-071/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-071] Southeast Asia · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-071/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: IEC 61850 substation protocol & EMC immunity; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-071/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-071)
[UT-HW-2612-073 · UT-CAT-06](/demands/ut-hw-2612-073/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-073] North America · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-073/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 60601-1 / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 60601-1 IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-073/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-073)
[UT-HW-2612-082 · UT-CAT-08](/demands/ut-hw-2612-082/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-082] Southeast Asia · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-082/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: IEC 61850 substation protocol & EMC immunity; 3D vision/LiDAR sensing & high-flex drag-chain harnesses; uncooled thermal imaging module & IP67 housing. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 / IEC 61850 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4 IEC 61850
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-082/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-082)
[UT-HW-2612-083 · UT-CAT-08](/demands/ut-hw-2612-083/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-083] Commonwealth, North America & Europe · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-083/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-083/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-083)
[UT-HW-2612-084 · UT-CAT-08](/demands/ut-hw-2612-084/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-084] North America · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-084/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses; uncooled thermal imaging module & IP67 housing. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-084/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-084)
[UT-HW-2612-102 · UT-CAT-07](/demands/ut-hw-2612-102/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-102] Commonwealth, North America & Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-102/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-102/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-102)
[UT-HW-2612-110 · UT-CAT-07](/demands/ut-hw-2612-110/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-110] International Multilateral Procurement · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-110/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-110/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-110)
[UT-HW-2612-111 · UT-CAT-07](/demands/ut-hw-2612-111/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-111] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-111/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-111/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-111)
[UT-HW-2612-119 · UT-CAT-07](/demands/ut-hw-2612-119/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-119] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 200–500 Units (Annual Standing Pool))](/en/demands/ut-hw-2612-119/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 200–500 Units (Annual Standing Pool). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 200–500 Units (Annual Standing Pool)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-119/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-119)
[UT-HW-2612-120 · UT-CAT-07](/demands/ut-hw-2612-120/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-120] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-120/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-120/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-120)
[UT-HW-2612-121 · UT-CAT-07](/demands/ut-hw-2612-121/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-121] Western & Northern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-121/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-121/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-121)
[UT-HW-2612-124 · UT-CAT-08](/demands/ut-hw-2612-124/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-124] Asia-Pacific & Oceania · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 50–150 Sets (Framework Call-Offs))](/en/demands/ut-hw-2612-124/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–150 Sets (Framework Call-Offs). Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH / IEC 61850 compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH IEC 61850
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–150 Sets (Framework Call-Offs)
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-124/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-124)
[UT-HW-2612-126 · UT-CAT-08](/demands/ut-hw-2612-126/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-126] Middle East & Emerging Markets · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-126/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-126/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-126)
[UT-HW-2612-129 · UT-CAT-08](/demands/ut-hw-2612-129/)
DPS_STANDING · Standing DPS Pool · Window >4 Weeks

### [[UT-HW-2612-129] Commonwealth, North America & Europe · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 100–300 Sets (Rolling Batches))](/en/demands/ut-hw-2612-129/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–300 Sets (Rolling Batches)
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-129/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-129)

## 2. Fixed-Window Public RFPs (FIXED_RFP · 101 Notices · Window >4 Weeks)

Active international hardware procurement notices with >4-week engineering specification alignment and sample verification windows.

[UT-HW-2612-001 · UT-CAT-01](/demands/ut-hw-2612-001/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-001] Pan-European & Central-Southern Europe · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-001/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: DWDM mux/demux low-insertion-loss optics; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-001/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-001)
[UT-HW-2612-002 · UT-CAT-01](/demands/ut-hw-2612-002/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-002] Pan-European & Central-Southern Europe · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-002/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: 10G/25G/100G multi-rate ports; DWDM mux/demux low-insertion-loss optics; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-002/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-002)
[UT-HW-2612-003 · UT-CAT-01](/demands/ut-hw-2612-003/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-003] Asia-Pacific & Oceania · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-003/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-003/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-003)
[UT-HW-2612-004 · UT-CAT-01](/demands/ut-hw-2612-004/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-004] Southeast Asia · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-004/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: 400G/100G optical-copper interfaces; 10G/25G/100G multi-rate ports; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 / IEEE 802.3ck compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754 IEEE 802.3ck
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-004/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-004)
[UT-HW-2612-005 · UT-CAT-01](/demands/ut-hw-2612-005/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-005] Pan-European & Central-Southern Europe · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-005/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: 400G/100G optical-copper interfaces; 10G/25G/100G multi-rate ports; DWDM mux/demux low-insertion-loss optics. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 / IEEE 802.3ck compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754 IEEE 802.3ck
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-005/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-005)
[UT-HW-2612-006 · UT-CAT-01](/demands/ut-hw-2612-006/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-006] Pan-European & Central-Southern Europe · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-006/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: 400G/100G optical-copper interfaces; 10G/25G/100G multi-rate ports; DWDM mux/demux low-insertion-loss optics. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 / IEEE 802.3ck compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754 IEEE 802.3ck
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-006/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-006)
[UT-HW-2612-007 · UT-CAT-01](/demands/ut-hw-2612-007/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-007] Asia-Pacific & Oceania · High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-007/)

Scope: High-Speed Optical Transceivers & Low-Loss MPO Interconnect Assemblies. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IEC 61754 compliance documentation and factory test reports.

CE FCC RoHS REACH IEC 61754
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Wuhan (Hubei) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-007/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-007)
[UT-HW-2612-008 · UT-CAT-02](/demands/ut-hw-2612-008/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-008] Pan-European & Central-Southern Europe · Internal PCIe Gen5 High-Speed Harnesses & SFF-8654 Backplane Assemblies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-008/)

Scope: Internal PCIe Gen5 High-Speed Harnesses & SFF-8654 Backplane Assemblies. Engineering Specs: MPO/APC pre-terminated trunks (3D interferometry); PCIe Gen5 & SFF-8654 (85-ohm TDR verified); IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 100–250 Units. Required Standards & QA: PCIe Gen5 / SFF-8654 / RoHS / REACH / UL94V-0 / IEC 60601-1 compliance documentation and factory test reports.

PCIe Gen5 SFF-8654 RoHS REACH UL94V-0 IEC 60601-1
**Pavilion Track:** UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Songjiang · Dongguan (Guangdong) · Shenzhen (Guangdong) · Kunshan (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-008/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-008)
[UT-HW-2612-009 · UT-CAT-02](/demands/ut-hw-2612-009/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-009] Asia-Pacific & Oceania · Internal PCIe Gen5 High-Speed Harnesses & SFF-8654 Backplane Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-009/)

Scope: Internal PCIe Gen5 High-Speed Harnesses & SFF-8654 Backplane Assemblies. Engineering Specs: PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 50–100 Sets. Required Standards & QA: PCIe Gen5 / SFF-8654 / RoHS / REACH / UL94V-0 compliance documentation and factory test reports.

PCIe Gen5 SFF-8654 RoHS REACH UL94V-0
**Pavilion Track:** UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Songjiang · Dongguan (Guangdong) · Shenzhen (Guangdong) · Kunshan (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-009/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-009)
[UT-HW-2612-010 · UT-CAT-01](/demands/ut-hw-2612-010/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-010] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-010/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: PCIe Gen5 & SFF-8654 (85-ohm TDR verified); IEEE 802.3ck active/passive twinax assemblies; metered smart rack PDU & branch monitoring. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-010/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-010)
[UT-HW-2612-011 · UT-CAT-01](/demands/ut-hw-2612-011/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-011] Southeast Asia · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-011/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; MPO/APC pre-terminated trunks (3D interferometry); metered smart rack PDU & branch monitoring. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-011/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-011)
[UT-HW-2612-012 · UT-CAT-01](/demands/ut-hw-2612-012/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-012] Southeast Asia · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-012/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: MPO/APC pre-terminated trunks (3D interferometry); PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-012/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-012)
[UT-HW-2612-013 · UT-CAT-01](/demands/ut-hw-2612-013/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-013] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-013/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: MPO/APC pre-terminated trunks (3D interferometry); IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-013/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-013)
[UT-HW-2612-014 · UT-CAT-01](/demands/ut-hw-2612-014/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-014] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-014/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-014/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-014)
[UT-HW-2612-015 · UT-CAT-01](/demands/ut-hw-2612-015/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-015] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-015/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: MPO/APC pre-terminated trunks (3D interferometry); IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-015/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-015)
[UT-HW-2612-016 · UT-CAT-01](/demands/ut-hw-2612-016/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-016] Southeast Asia · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-016/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; IEEE 802.3ck active/passive twinax assemblies; out-of-band IP-KVM & serial console appliances. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-016/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-016)
[UT-HW-2612-017 · UT-CAT-01](/demands/ut-hw-2612-017/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-017] International Multilateral Procurement · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-017/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: metered smart rack PDU & branch monitoring; out-of-band IP-KVM & serial console appliances; high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-017/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-017)
[UT-HW-2612-018 · UT-CAT-01](/demands/ut-hw-2612-018/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-018] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-018/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-018/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-018)
[UT-HW-2612-019 · UT-CAT-01](/demands/ut-hw-2612-019/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-019] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-019/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: MPO/APC pre-terminated trunks (3D interferometry); metered smart rack PDU & branch monitoring; IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE / IEC 60601-1 compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE IEC 60601-1
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-019/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-019)
[UT-HW-2612-020 · UT-CAT-01](/demands/ut-hw-2612-020/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-020] International Multilateral Procurement · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-020/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-020/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-020)
[UT-HW-2612-021 · UT-CAT-01](/demands/ut-hw-2612-021/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-021] Asia-Pacific & Oceania · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-021/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-021/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-021)
[UT-HW-2612-022 · UT-CAT-01](/demands/ut-hw-2612-022/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-022] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-022/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-022/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-022)
[UT-HW-2612-023 · UT-CAT-01](/demands/ut-hw-2612-023/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-023] Pan-European & Central-Southern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-023/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-023/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-023)
[UT-HW-2612-024 · UT-CAT-01](/demands/ut-hw-2612-024/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-024] Asia-Pacific & Oceania · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-024/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-024/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-024)
[UT-HW-2612-025 · UT-CAT-01](/demands/ut-hw-2612-025/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-025] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-025/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 400G/100G optical-copper interfaces; IEEE 802.3ck active/passive twinax assemblies; high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-025/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-025)
[UT-HW-2612-026 · UT-CAT-01](/demands/ut-hw-2612-026/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-026] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-026/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 10G/25G/100G multi-rate ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified); metered smart rack PDU & branch monitoring. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-026/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-026)
[UT-HW-2612-027 · UT-CAT-01](/demands/ut-hw-2612-027/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-027] North America · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-027/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; 400G/100G optical-copper interfaces; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-027/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-027)
[UT-HW-2612-028 · UT-CAT-01](/demands/ut-hw-2612-028/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-028] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-028/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; 400G/100G optical-copper interfaces; PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-028/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-028)
[UT-HW-2612-029 · UT-CAT-01](/demands/ut-hw-2612-029/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-029] Western & Northern Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-029/)

Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; 400G/100G optical-copper interfaces; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.

IEEE 802.3ck PCIe Gen5 RoHS REACH CE
**Pavilion Track:** UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-029/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-029)
[UT-HW-2612-036 · UT-CAT-03](/demands/ut-hw-2612-036/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-036] Asia-Pacific & Oceania · Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-036/)

Scope: Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits. Engineering Specs: 400G/100G optical-copper interfaces; 10G/25G/100G multi-rate ports; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / CE / FCC / RoHS / REACH compliance documentation and factory test reports.

IEEE 802.3ck CE FCC RoHS REACH
**Pavilion Track:** UT-CAT-03 Open Network Switching & Campus High-Reliability Comms Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Hangzhou (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-036/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-036)
[UT-HW-2612-037 · UT-CAT-03](/demands/ut-hw-2612-037/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-037] Commonwealth, North America & Europe · Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-037/)

Scope: Open-Architecture Ethernet Switching Hardware & Optical-Copper Port Kits. Engineering Specs: 10G/25G/100G multi-rate ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 20–50 Sets. Required Standards & QA: IEEE 802.3ck / CE / FCC / RoHS / REACH / PCIe Gen5 compliance documentation and factory test reports.

IEEE 802.3ck CE FCC RoHS REACH PCIe Gen5
**Pavilion Track:** UT-CAT-03 Open Network Switching & Campus High-Reliability Comms Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Minhang · Suzhou (Jiangsu) · Hangzhou (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-037/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-037)
[UT-HW-2612-039 · UT-CAT-02](/demands/ut-hw-2612-039/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-039] International Multilateral Procurement · PCIe Gen5 Offload SmartNICs & Hardware Telemetry Capture Subsystems (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-039/)

Scope: PCIe Gen5 Offload SmartNICs & Hardware Telemetry Capture Subsystems. Engineering Specs: PCIe Gen5 & SFF-8654 (85-ohm TDR verified). Estimated Batch: 50–100 Sets. Required Standards & QA: PCIe Gen5 / CE / FCC / RoHS / REACH compliance documentation and factory test reports.

PCIe Gen5 CE FCC RoHS REACH
**Pavilion Track:** UT-CAT-02 Compute Node Internal High-Speed Harness & Acceleration Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Zhangjiang · Beijing Cluster · Nanjing/Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-039/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-039)
[UT-HW-2612-041 · UT-CAT-04](/demands/ut-hw-2612-041/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-041] Pan-European & Central-Southern Europe · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-041/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / CB / RoHS / REACH compliance documentation and factory test reports.

CE UL CB RoHS REACH
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-041/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-041)
[UT-HW-2612-042 · UT-CAT-04](/demands/ut-hw-2612-042/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-042] Western & Northern Europe · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-042/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: 10G/25G/100G multi-rate ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified); high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / UL / CB / RoHS / REACH / PCIe Gen5 compliance documentation and factory test reports.

CE UL CB RoHS REACH PCIe Gen5
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-042/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-042)
[UT-HW-2612-043 · UT-CAT-04](/demands/ut-hw-2612-043/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-043] Asia-Pacific & Oceania · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-043/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / CB / RoHS / REACH / IEC 60601-1 compliance documentation and factory test reports.

CE UL CB RoHS REACH IEC 60601-1
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-043/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-043)
[UT-HW-2612-044 · UT-CAT-04](/demands/ut-hw-2612-044/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-044] Pan-European & Central-Southern Europe · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-044/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / CB / RoHS / REACH / IEC 61850 compliance documentation and factory test reports.

CE UL CB RoHS REACH IEC 61850
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-044/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-044)
[UT-HW-2612-045 · UT-CAT-04](/demands/ut-hw-2612-045/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-045] Western & Northern Europe · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-045/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: 10G/25G/100G multi-rate ports; PCIe Gen5 & SFF-8654 (85-ohm TDR verified); high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / UL / CB / RoHS / REACH / PCIe Gen5 compliance documentation and factory test reports.

CE UL CB RoHS REACH PCIe Gen5
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-045/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-045)
[UT-HW-2612-046 · UT-CAT-04](/demands/ut-hw-2612-046/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-046] International Multilateral Procurement · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-046/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / CB / RoHS / REACH compliance documentation and factory test reports.

CE UL CB RoHS REACH
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-046/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-046)
[UT-HW-2612-047 · UT-CAT-04](/demands/ut-hw-2612-047/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-047] International Multilateral Procurement · Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-047/)

Scope: Titanium-Efficiency Redundant Server PSUs (CRPS) & Industrial Power Supplies. Engineering Specs: low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / CB / RoHS / REACH compliance documentation and factory test reports.

CE UL CB RoHS REACH
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Cluster · Shenzhen/Guangzhou/Dongguan · Suzhou (Jiangsu)
[View Engineering Spec Card →](/demands/ut-hw-2612-047/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-047)
[UT-HW-2612-048 · UT-CAT-04](/demands/ut-hw-2612-048/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-048] Pan-European & Central-Southern Europe · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-048/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: metered smart rack PDU & branch monitoring; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-048/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-048)
[UT-HW-2612-049 · UT-CAT-04](/demands/ut-hw-2612-049/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-049] International Multilateral Procurement · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-049/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: metered smart rack PDU & branch monitoring. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-049/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-049)
[UT-HW-2612-050 · UT-CAT-04](/demands/ut-hw-2612-050/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-050] Pan-European & Central-Southern Europe · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-050/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: IEEE 802.3ck active/passive twinax assemblies; out-of-band IP-KVM & serial console appliances. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 / IEEE 802.3ck compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3 IEEE 802.3ck
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-050/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-050)
[UT-HW-2612-051 · UT-CAT-04](/demands/ut-hw-2612-051/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-051] Asia-Pacific & Oceania · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-051/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: metered smart rack PDU & branch monitoring; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 / IEC 61850 compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3 IEC 61850
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-051/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-051)
[UT-HW-2612-052 · UT-CAT-04](/demands/ut-hw-2612-052/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-052] International Multilateral Procurement · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-052/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: 10G/25G/100G multi-rate ports; metered smart rack PDU & branch monitoring; out-of-band IP-KVM & serial console appliances. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-052/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-052)
[UT-HW-2612-053 · UT-CAT-04](/demands/ut-hw-2612-053/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-053] North America · High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-053/)

Scope: High-Density Metered Smart Rack PDUs & Out-of-Band IP-KVM Consoles. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; metered smart rack PDU & branch monitoring; out-of-band IP-KVM & serial console appliances. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / RoHS / REACH / SNMPv3 / IEEE 802.3ck compliance documentation and factory test reports.

CE UL RoHS REACH SNMPv3 IEEE 802.3ck
**Pavilion Track:** UT-CAT-04 Smart Rack Power Distribution, High-Efficiency PSU & OOB Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Songjiang/Pudong · Ningbo/Yueqing (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-053/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-053)
[UT-HW-2612-055 · UT-CAT-05](/demands/ut-hw-2612-055/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-055] Middle East & Emerging Markets · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-055/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-055/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-055)
[UT-HW-2612-056 · UT-CAT-05](/demands/ut-hw-2612-056/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-056] Western & Northern Europe · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-056/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-056/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-056)
[UT-HW-2612-057 · UT-CAT-05](/demands/ut-hw-2612-057/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-057] Southeast Asia · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-057/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-057/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-057)
[UT-HW-2612-058 · UT-CAT-05](/demands/ut-hw-2612-058/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-058] Asia-Pacific & Oceania · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-058/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-058/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-058)
[UT-HW-2612-059 · UT-CAT-05](/demands/ut-hw-2612-059/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-059] Asia-Pacific & Oceania · Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-059/)

Scope: Hardwired (No-RF) Fanless Industrial Edge AI Box & Control Gateways. Engineering Specs: 10G/25G/100G multi-rate ports; high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 100–250 Units. Required Standards & QA: CE / UL / RoHS / REACH / No-RF compliance documentation and factory test reports.

CE UL RoHS REACH No-RF
**Pavilion Track:** UT-CAT-05 Industrial Edge AI, Embedded SOM & Optoelectronic Sensing Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Songjiang/Minhang · Suzhou/Nanjing (Jiangsu) · Shenzhen/Guangzhou (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-059/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-059)
[UT-HW-2612-065 · UT-CAT-06](/demands/ut-hw-2612-065/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-065] Pan-European & Central-Southern Europe · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-065/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-065/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-065)
[UT-HW-2612-066 · UT-CAT-06](/demands/ut-hw-2612-066/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-066] Pan-European & Central-Southern Europe · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-066/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-066/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-066)
[UT-HW-2612-067 · UT-CAT-06](/demands/ut-hw-2612-067/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-067] Pan-European & Central-Southern Europe · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-067/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: IEC 61850 substation protocol & EMC immunity; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 20–50 Sets. Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-067/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-067)
[UT-HW-2612-069 · UT-CAT-06](/demands/ut-hw-2612-069/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-069] Western & Northern Europe · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-069/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: metered smart rack PDU & branch monitoring; high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 61850 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 61850
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-069/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-069)
[UT-HW-2612-072 · UT-CAT-06](/demands/ut-hw-2612-072/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-072] Western & Northern Europe · High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-072/)

Scope: High-Layer-Count Low-Loss PCBs (HLC/HDI) & Precision PCBA Sub-Assemblies. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 50–100 Sets. Required Standards & QA: IPC-A-600 / ISO 9001 / RoHS / REACH / UL / IEC 60601-1 compliance documentation and factory test reports.

IPC-A-600 ISO 9001 RoHS REACH UL IEC 60601-1
**Pavilion Track:** UT-CAT-06 Low-Loss High-Layer PCB & Precision PCBA Assembly Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Kunshan/Nantong (Jiangsu) · Shenzhen/Huizhou/Meizhou/Zhuhai · Huangshi (Hubei) · Ganzhou (Jiangxi)
[View Engineering Spec Card →](/demands/ut-hw-2612-072/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-072)
[UT-HW-2612-074 · UT-CAT-08](/demands/ut-hw-2612-074/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-074] Asia-Pacific & Oceania · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-074/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 / IEC 60601-1 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4 IEC 60601-1
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-074/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-074)
[UT-HW-2612-075 · UT-CAT-08](/demands/ut-hw-2612-075/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-075] Asia-Pacific & Oceania · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-075/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-075/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-075)
[UT-HW-2612-076 · UT-CAT-08](/demands/ut-hw-2612-076/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-076] Western & Northern Europe · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-076/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-076/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-076)
[UT-HW-2612-077 · UT-CAT-08](/demands/ut-hw-2612-077/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-077] Southeast Asia · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-077/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-077/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-077)
[UT-HW-2612-078 · UT-CAT-08](/demands/ut-hw-2612-078/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-078] North America · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-078/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-078/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-078)
[UT-HW-2612-079 · UT-CAT-08](/demands/ut-hw-2612-079/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-079] Pan-European & Central-Southern Europe · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-079/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 / IEC 60601-1 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4 IEC 60601-1
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-079/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-079)
[UT-HW-2612-080 · UT-CAT-08](/demands/ut-hw-2612-080/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-080] North America · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-080/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-080/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-080)
[UT-HW-2612-081 · UT-CAT-08](/demands/ut-hw-2612-081/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-081] Western & Northern Europe · Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-081/)

Scope: Embodied 3D Structured-Light/ToF Vision, LiDAR & High-Flex Harness Kits. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / ISO 3691-4 compliance documentation and factory test reports.

CE FCC RoHS REACH ISO 3691-4
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Pudong/Jiading · Suzhou (Jiangsu) · Ningbo/Shaoxing (Zhejiang) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-081/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-081)
[UT-HW-2612-085 · UT-CAT-07](/demands/ut-hw-2612-085/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-085] North America · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-085/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: metered smart rack PDU & branch monitoring; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-085/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-085)
[UT-HW-2612-086 · UT-CAT-07](/demands/ut-hw-2612-086/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-086] North America · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-086/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** North America | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-086/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-086)
[UT-HW-2612-087 · UT-CAT-07](/demands/ut-hw-2612-087/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-087] Western & Northern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-087/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-087/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-087)
[UT-HW-2612-088 · UT-CAT-07](/demands/ut-hw-2612-088/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-088] Commonwealth, North America & Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-088/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-088/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-088)
[UT-HW-2612-089 · UT-CAT-07](/demands/ut-hw-2612-089/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-089] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-089/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 60601-1 2xMOPP isolation & ISO 13485 quality; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 / IEC 60601-1 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67 IEC 60601-1
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-089/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-089)
[UT-HW-2612-090 · UT-CAT-07](/demands/ut-hw-2612-090/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-090] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-090/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: metered smart rack PDU & branch monitoring; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-090/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-090)
[UT-HW-2612-091 · UT-CAT-07](/demands/ut-hw-2612-091/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-091] Western & Northern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-091/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-091/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-091)
[UT-HW-2612-092 · UT-CAT-07](/demands/ut-hw-2612-092/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-092] Commonwealth, North America & Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-092/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-092/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-092)
[UT-HW-2612-093 · UT-CAT-07](/demands/ut-hw-2612-093/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-093] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-093/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-093/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-093)
[UT-HW-2612-094 · UT-CAT-07](/demands/ut-hw-2612-094/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-094] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-094/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-094/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-094)
[UT-HW-2612-095 · UT-CAT-07](/demands/ut-hw-2612-095/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-095] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-095/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-095/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-095)
[UT-HW-2612-096 · UT-CAT-07](/demands/ut-hw-2612-096/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-096] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-096/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity; uncooled thermal imaging module & IP67 housing. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-096/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-096)
[UT-HW-2612-097 · UT-CAT-07](/demands/ut-hw-2612-097/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-097] Western & Northern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-097/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-097/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-097)
[UT-HW-2612-098 · UT-CAT-07](/demands/ut-hw-2612-098/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-098] Pan-European & Central-Southern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-098/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-098/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-098)
[UT-HW-2612-099 · UT-CAT-07](/demands/ut-hw-2612-099/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-099] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-099/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity; 3D vision/LiDAR sensing & high-flex drag-chain harnesses. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-099/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-099)
[UT-HW-2612-100 · UT-CAT-07](/demands/ut-hw-2612-100/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-100] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-100/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-100/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-100)
[UT-HW-2612-101 · UT-CAT-07](/demands/ut-hw-2612-101/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-101] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-101/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-101/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-101)
[UT-HW-2612-103 · UT-CAT-07](/demands/ut-hw-2612-103/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-103] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-103/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-103/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-103)
[UT-HW-2612-104 · UT-CAT-07](/demands/ut-hw-2612-104/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-104] Western & Northern Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-104/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-104/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-104)
[UT-HW-2612-105 · UT-CAT-07](/demands/ut-hw-2612-105/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-105] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-105/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-105/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-105)
[UT-HW-2612-106 · UT-CAT-07](/demands/ut-hw-2612-106/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-106] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-106/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-106/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-106)
[UT-HW-2612-107 · UT-CAT-07](/demands/ut-hw-2612-107/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-107] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-107/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-107/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-107)
[UT-HW-2612-108 · UT-CAT-07](/demands/ut-hw-2612-108/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-108] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-108/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-108/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-108)
[UT-HW-2612-109 · UT-CAT-07](/demands/ut-hw-2612-109/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-109] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-109/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: metered smart rack PDU & branch monitoring; high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-109/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-109)
[UT-HW-2612-112 · UT-CAT-07](/demands/ut-hw-2612-112/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-112] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-112/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-112/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-112)
[UT-HW-2612-113 · UT-CAT-07](/demands/ut-hw-2612-113/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-113] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-113/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-113/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-113)
[UT-HW-2612-114 · UT-CAT-07](/demands/ut-hw-2612-114/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-114] Commonwealth, North America & Europe · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-114/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Commonwealth, North America & Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-114/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-114)
[UT-HW-2612-115 · UT-CAT-07](/demands/ut-hw-2612-115/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-115] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-115/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-115/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-115)
[UT-HW-2612-116 · UT-CAT-07](/demands/ut-hw-2612-116/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-116] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-116/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-116/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-116)
[UT-HW-2612-117 · UT-CAT-07](/demands/ut-hw-2612-117/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-117] International Multilateral Procurement · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-117/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-117/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-117)
[UT-HW-2612-118 · UT-CAT-07](/demands/ut-hw-2612-118/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-118] Middle East & Emerging Markets · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-118/)

Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.

IEC 61850 CE RoHS REACH IP67
**Pavilion Track:** UT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
**Target Macro-Region:** Middle East & Emerging Markets | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-118/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-118)
[UT-HW-2612-122 · UT-CAT-08](/demands/ut-hw-2612-122/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-122] Western & Northern Europe · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-122/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Western & Northern Europe | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-122/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-122)
[UT-HW-2612-123 · UT-CAT-08](/demands/ut-hw-2612-123/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-123] Pan-European & Central-Southern Europe · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 50–100 Sets)](/en/demands/ut-hw-2612-123/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Pan-European & Central-Southern Europe | **Estimated Batch Band:** 50–100 Sets
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-123/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-123)
[UT-HW-2612-125 · UT-CAT-08](/demands/ut-hw-2612-125/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-125] Asia-Pacific & Oceania · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-125/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-125/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-125)
[UT-HW-2612-127 · UT-CAT-08](/demands/ut-hw-2612-127/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-127] Asia-Pacific & Oceania · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-127/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Asia-Pacific & Oceania | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-127/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-127)
[UT-HW-2612-128 · UT-CAT-08](/demands/ut-hw-2612-128/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-128] Southeast Asia · IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-128/)

Scope: IEC 60601-1 (2xMOPP) Medical Isolation PSUs, Clinical Optical & Harness Modules. Engineering Specs: IEC 60601-1 2xMOPP isolation & ISO 13485 quality; 3D vision/LiDAR sensing & high-flex drag-chain harnesses; low-Dk multi-layer PCB & IPC Class 3 SMT assembly. Estimated Batch: 100–250 Units. Required Standards & QA: IEC 60601-1 / ISO 13485 / CE / RoHS / REACH compliance documentation and factory test reports.

IEC 60601-1 ISO 13485 CE RoHS REACH
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Zhangjiang Med Valley · Suzhou (Jiangsu) · Qingdao (Shandong) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-128/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-128)
[UT-HW-2612-130 · UT-CAT-08](/demands/ut-hw-2612-130/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-130] Southeast Asia · Civil Inspection Optoelectronic Gimbals, RTK Positioning & Tethered Harnesses (Batch Volume: 20–50 Sets)](/en/demands/ut-hw-2612-130/)

Scope: Civil Inspection Optoelectronic Gimbals, RTK Positioning & Tethered Harnesses. Engineering Specs: 3D vision/LiDAR sensing & high-flex drag-chain harnesses; uncooled thermal imaging module & IP67 housing. Estimated Batch: 20–50 Sets. Required Standards & QA: CE / FCC / RoHS / REACH / IP66 compliance documentation and factory test reports.

CE FCC RoHS REACH IP66
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** Southeast Asia | **Estimated Batch Band:** 20–50 Sets
**Invited Industrial Belts:** Shanghai Qingpu/Lingang · Nanjing/Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-130/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-130)
[UT-HW-2612-131 · UT-CAT-08](/demands/ut-hw-2612-131/)
FIXED_RFP · Demand Window >4 Weeks

### [[UT-HW-2612-131] International Multilateral Procurement · Civil Inspection Optoelectronic Gimbals, RTK Positioning & Tethered Harnesses (Batch Volume: 100–250 Units)](/en/demands/ut-hw-2612-131/)

Scope: Civil Inspection Optoelectronic Gimbals, RTK Positioning & Tethered Harnesses. Engineering Specs: industrial wide-temperature hardware & 100% factory QC reports. Estimated Batch: 100–250 Units. Required Standards & QA: CE / FCC / RoHS / REACH / IP66 compliance documentation and factory test reports.

CE FCC RoHS REACH IP66
**Pavilion Track:** UT-CAT-08 Medical Safety Power, Embodied Robotics & Low-Altitude Payload Pavilion
**Target Macro-Region:** International Multilateral Procurement | **Estimated Batch Band:** 100–250 Units
**Invited Industrial Belts:** Shanghai Qingpu/Lingang · Nanjing/Suzhou (Jiangsu) · Shenzhen (Guangdong)
[View Engineering Spec Card →](/demands/ut-hw-2612-131/)
[Submit Supplier Capability →](/supplier-apply/?code=UT-HW-2612-131)

---

U-TRADE GATEWAY LIMITED (佑貿通（香港）有限公司) · Contact: info@umaotong.com

U-TRADE GATEWAY LIMITED (佑貿通（香港）有限公司) acts solely as a cross-border information coordination carrier, not as a buyer/seller counterparty, escrow agent, or money service / remittance institution, and neither issues hardware Proforma Invoices (PI) nor guarantees delivery; the 1%+1% pilot service fee is governed strictly by separately executed written agreements. 佑貿通（香港）有限公司仅为跨境信息协同载体，非买卖当事方、托管或汇兑机构，不出具硬件PI亦不作交付担保；1%+1%试点服务费依另签书面协议执行。

© 2026 佑貿通（香港）有限公司 / U-TRADE GATEWAY LIMITED · info@umaotong.com
