UT-HW-2612-017 · UT-CAT-01
FIXED_RFP · Demand Window >4 Weeks (>4 weeks)
[UT-HW-2612-017] International Multilateral Procurement · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–250 Units)
Target Macro-Region
International Multilateral Procurement
Estimated Batch Band
100–250 Units
Demand Window Status
Demand Window >4 Weeks (>4 weeks)
| Pavilion Track | UT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion |
|---|---|
| Procurement Mode | FIXED_RFP |
| Target Macro-Region | International Multilateral Procurement |
| Estimated Batch Band | 100–250 Units |
| Hardware Scope | IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling |
| Structured Technical Parameters |
|
| Mandatory International Certifications | |
| Compliance & QA Baseline | IEEE 802 |
| Full Genericized Engineering Specification | Scope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: metered smart rack PDU & branch monitoring; out-of-band IP-KVM & serial console appliances; high-efficiency redundant CRPS & DIN-rail power. Estimated Batch: 100–250 Units. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports. |
| Invited Industrial Belts | Shanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu) |
| Corporate Capability Submission | Submit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected]) Submit Corporate Capability & Certifications (UT-HW-2612-017) → · /en/supplier-apply/?code=UT-HW-2612-017 |
Meet the structured technical parameters and mandatory international certifications?
Submit Corporate Capability & Certifications →
Submit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])