UT-HW-2612-027 · UT-CAT-01
FIXED_RFP · Demand Window >4 Weeks (>4 weeks)

[UT-HW-2612-027] North America · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 50–100 Sets)

Target Macro-Region North America
Estimated Batch Band 50–100 Sets
Demand Window Status Demand Window >4 Weeks (>4 weeks)
Pavilion TrackUT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
Procurement ModeFIXED_RFP
Target Macro-RegionNorth America
Estimated Batch Band50–100 Sets
Hardware ScopeIEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling
Structured Technical Parameters
  • 800G/400G OSFP/QSFP-DD ports
  • 400G/100G optical-copper interfaces
  • MPO/APC pre-terminated trunks (3D interferometry)
Mandatory International Certifications
IEEE 802.3ckPCIe Gen5RoHSREACHCE
Compliance & QA BaselineIEEE 802
Full Genericized Engineering SpecificationScope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: 800G/400G OSFP/QSFP-DD ports; 400G/100G optical-copper interfaces; MPO/APC pre-terminated trunks (3D interferometry). Estimated Batch: 50–100 Sets. Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.
Invited Industrial BeltsShanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
Corporate Capability SubmissionSubmit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])
Submit Corporate Capability & Certifications (UT-HW-2612-027) → · /en/supplier-apply/?code=UT-HW-2612-027
Meet the structured technical parameters and mandatory international certifications?

Submit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])

Submit Corporate Capability & Certifications →