UT-HW-2612-033 · UT-CAT-01
DPS_STANDING · Standing DPS Pool · Window >4 Weeks (>4 weeks)

[UT-HW-2612-033] Commonwealth, North America & Europe · IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling (Batch Volume: 100–300 Sets (Rolling Batches))

Target Macro-Region Commonwealth, North America & Europe
Estimated Batch Band 100–300 Sets (Rolling Batches)
Demand Window Status Standing DPS Pool · Window >4 Weeks (>4 weeks)
Pavilion TrackUT-CAT-01 High-Speed Optical-Copper & Data Center Network Pavilion
Procurement ModeDPS_STANDING
Target Macro-RegionCommonwealth, North America & Europe
Estimated Batch Band100–300 Sets (Rolling Batches)
Hardware ScopeIEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling
Structured Technical Parameters
  • IEEE 802.3ck active/passive twinax assemblies
Mandatory International Certifications
IEEE 802.3ckPCIe Gen5RoHSREACHCE
Compliance & QA BaselineIEEE 802
Full Genericized Engineering SpecificationScope: IEEE 802.3ck High-Speed Direct Attach Copper (DAC/AEC) & Trunk Cabling. Engineering Specs: IEEE 802.3ck active/passive twinax assemblies. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEEE 802.3ck / PCIe Gen5 / RoHS / REACH / CE compliance documentation and factory test reports.
Invited Industrial BeltsShanghai Cluster · Shenzhen/Dongguan/Huizhou · Suzhou/Changzhou (Jiangsu)
Corporate Capability SubmissionSubmit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])
Submit Corporate Capability & Certifications (UT-HW-2612-033) → · /en/supplier-apply/?code=UT-HW-2612-033
Meet the structured technical parameters and mandatory international certifications?

Submit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])

Submit Corporate Capability & Certifications →