UT-HW-2612-111 · UT-CAT-07 DPS_STANDING · Standing DPS Pool · Window >4 Weeks

[UT-HW-2612-111] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 100–300 Sets (Rolling Batches))

Pavilion TrackUT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
Procurement ModeDPS_STANDING
Window StatusStanding DPS Pool · Window >4 Weeks
Target Macro-RegionSoutheast Asia
Estimated Batch Band100–300 Sets (Rolling Batches)
Structured Technical Parameters
  • Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts
  • Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity
  • Estimated Batch: 100–300 Sets (Rolling Batches)
  • Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports
Genericized Engineering Specification & QA BaselineScope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 100–300 Sets (Rolling Batches). Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.
Mandatory International Certifications
IEC 61850CERoHSREACHIP67
Invited Industrial BeltsShanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
Corporate Capability SubmissionSubmit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED ([email protected])
UT-HW-2612-111 · Southeast Asia · 100–300 Sets (Rolling Batches)
Submit Corporate Capability & Certifications (UT-HW-2612-111) → (EN)